Skip to main content
The image shows the Master Drilling logo. The logo consists of a white lowercase "m" on a blue background with a segment of drilling equipment integrated into the letter. To the right of the logo, the words "Master Drilling" are displayed in bold, dark gray capital letters.
ENPT

Energy: Ituango Hydroelectric Project

The Challenge

A 47° hole with directional drilling (staying within a 50cm radius) had to be achieved for the first time

Our Solution

Master Drilling addressed the following project challenges:

Master Drilling embarked on the project, servicing the country’s largest hydroelectric project when it reaches full operation, producing up to 2.4GW

The total scope was 2462m (2131m x 4.1 diameter x 90° and 331 m x 2.4 diameter hole with a 47° inclination, drilled with directional drilling)

The Result

Despite project start delays outside of Master Drilling’s control, the project was completed five months ahead of schedule

Measured scope

Project facts

Type of drilling type
Directional drilling
Machine
Use of 4 x 3250 DC drive machines
Excavation depth (m)
1 x 331 m x 47° x 2.4 m diameter and holes between 127 m x 90° and 80 m x 90° x 4,1 m diameter
Diameter
2,4 diameter and 4,1 diameter
Geology
Rock conditions: between poor and good formations.
Project Owner
Concorcio Ituango